Fee Schedule
Building permit fees are estimated at the time of application. The estimate must be paid in full before plans review begins. During plans review the examiners will verify the fees. Any balance owing must be paid before the permit is issued.
The following by-law applies to all applications submitted after December 31, 2024.
Our current fees listed below are summarized from Schedule A of Markham's Building By-law #2024-206.
Â
Minimum Permit Fees
Description  | Fee  |
---|---|
Group C Residential construction  | $125  |
Group A, B, D, E and F occupancies  | $525  |
Private servicing of multiple lots (plumbing fees in addition to this fee) Â | $2,125 Â |
Non-residential Demolition  | $1,500  |
- Administrative Fees
Â
Row Description
ÂFee
Â1.1 Transfer application to another permit applicant or change project address
Â$300
Â1.2 Transfer permit to another Owner
Â$300
Â1.3 Add additional contacts to permit record for Building Inspection correspondence $125 per permit record 1.4 Building complaint leading to issuance of an Order $150 1.5 Order to Comply
Â$500
Â1.6 Subsequent visit or file review to determine compliance with Order to Comply $190 per hour
(minimum 1 h)1.7 Stop Work Order
Â$1,500
Â1.8 Unsafe Building
Â$800
Â1.9 Initial Site Visit related to Unsafe Building conducted after hours $190 per hour
(minimum 3 h)1.10 Order Respecting Occupancy
Â$1,500
Â1.11 Subsequent Visits / File Review to determine compliance with an Unsafe Building or Order Respecting Occupancy
Â$190 per hour
(minimum 1 h during business hours; 3 h outside of business hours)1.12 Order to Comply or Stop Work Order issued prior to building permit
Â50% of permit fee
(maximum $5000)
Â1.13 Order Maintenance Fee $1,000 1.14 Additional Inspections due to non-remedied infraction
Â$300
Â1.15 Additional Inspection due to work not sufficiently complete
Â$200
Â1.16 Extend permit expiry date past 12 months
Â2x Permit Fee
(maximum $3000)
Â1.17 Suspended permit / incomplete
Â$400 for housing
$825 for non-housing (Annual charge)
Â1.18 Permit Maintenance Fee for infill residential permits $2,000 1.19 Septic Maintenance Fee $300 1.20 Registration of an Order on Title $500
- General Permit Fees
ÂRow Description
ÂFee
Â2.1
ÂPre-Application Review
Â$100
Â2.2
ÂSupplementary submissions, shop drawings, and permit revisions
Â$125 per hour
Â2.3 Resubmission to address incorrectly declared Applicable Law $300 2.4 Revisions to forms due to incorrectly declared information $250 2.5 Partial permit fee for non-housing (when requested after permit application)
Â$1000
Â2.6 Alternative Solution — first submission
Â$3,500 for multiple-unit residential and non-residential
$800 for low rise residential
Â2.7 Alternative Solution — supplementary submission
Â$300 each
Â2.8 Certified Model Supplemental Reviews (additional elevations, corner upgrade, rear upgrade, alternate floor layout, walk-out condition, look-out condition) $125 each 2.9 Change of Certified Model to existing Repeat Permit
Â$300 plus difference in permit fees
Â2.10
ÂFee not listed in Building Bylaw
Â$40 for every $1,000 of Construction Value
Â2.11
ÂRemediation / demolition of premises used for production of illicit drugs
Â$5,000
Â2.12
ÂReinstallation of a previously approved Air Supported Structure
Â$1,000
Â
- Service Fees
Row
ÂDescription
ÂFee
Â3.1
ÂCertificate of Completion
Â$200
Â3.2
ÂCompliance Letter
Â$200
Â3.3
ÂProvincial License Applications (without a permit application)
Â$500
Â3.4
ÂProvincial License Applications (with a permit application)
Â$250
Â3.5
ÂSpatial Separation Agreements
Â$500
Â3.6
ÂZoning Preliminary Review – Low Rise Residential
Â$300Â
Â3.7
ÂZoning Preliminary Review – Interior alteration (including parking calculations)
Â$750 per unit
Â3.8
ÂZoning Preliminary Review — multiple-unit residential and non-residential projects
Â$1800 per building
Â3.9
ÂZoning Preliminary Review — Land Division
Â$1200 per lot
Â3.10 Zoning Preliminary Review — supplemental submissions $125 per hour 3.11
ÂZoning Searches
Â$125
Â3.12
ÂPre-Permit Consultation — per discipline
Â$800 for first submission
$300 for each resubmission
Â3.13 Reproduction of Documents $60 plus 110% cost of reproduction plus $125 per hour
- New Buildings and Additions (including Mezzanines or New Intermediate Floors)
Row
ÂDescription
ÂFee
ÂÂ Group A Assembly
ÂÂ A1
ÂTransportation Terminals
Â$23.15 per square metre
ÂA2
ÂPortable classrooms (each) (new or relocated)
Â$707 each
ÂA3
ÂOutdoor Pool
Â$16.16 per square metre
ÂA4
ÂAll Other Assembly Occupancies
Â$27.82 per square metre
ÂÂ Group B: Institutional
ÂÂ A5
ÂAll Institutional Occupancies
Â$30.11 per square metre
ÂÂ Group C: Residential
ÂÂ A6
ÂSingle Detached Dwelling (SDD)
Â$21.03 per square metre
ÂA7 Infill Residential Dwelling $23.57 per square metre A8
ÂMultiple Unit buildings less than 4 storeys high
Â$26.12 per square metre
ÂA9
ÂMultiple Unit buildings greater than 3 storeys, less than 13 storeys
Â$26.12 per square metre
ÂA10
ÂMultiple Unit buildings greater than 12 storeys high, less than 66 storeys or 250 m in height
Â$19.40 per square metre
ÂA11 Multiple Unit buildings greater than 65 storeys or 250 m in height $19.02 per square metre A12
ÂRepeat of Previously approved Certified Model
Â$17.24 per square metre
ÂA13
ÂHotel / Motel
Â$27.82 per square metre
ÂA14
ÂUnfinished Basement / Foundations
Â$7.17 per square metre
ÂA15
ÂDetached or semi-detached garage/carport
Â$673 each
ÂA16
ÂGarage incorporating a dwelling unit (GDU)
Â$1,964 each
ÂA17
ÂRepeat of previously approved GDU
Â$1,220 each
ÂA18
ÂAccessory utility building (ie. Garden shed, Gazebo) less than 20 m2
Â$144 each
ÂA19
ÂAccessory utility building (ie. Garden shed, Gazebo) 20 m2 or greater
Â$927 each
ÂA20 Single Detached Dwelling Unit (SDD) less than 37Â m2Â in building area $1,927 each A21
ÂDeck / Balcony / Covered Porch (each)
Â$144 each
ÂÂ Group D: Business and Personal Services
ÂÂ A22
ÂShell Only (including unfinished basement)
Â$17.94 per square metre
ÂA23
ÂPartitioned / Finished / Mezzanine
Â$23.15 per square metre
ÂA24
ÂTemporary Real Estate Sales Office
Â$2,728 each
ÂÂ Group E: Mercantile
ÂÂ A25
ÂShell Only (including unfinished basement)
Â$15.08 per square metre
ÂA26
ÂPartitioned / Finished / Mezzanine
Â$19.74 per square metre
ÂÂ Group F: Industrial
ÂÂ A27
ÂShell Only (including unfinished basement)
Â$11.66 per square metre
ÂA28
ÂPartitioned / Finished / Mezzanine
Â$16.14 per square metre
ÂA29
ÂGas Station / Canopy, Car Wash
Â$14.90 per square metre
ÂA30
ÂRepair garage
Â$16.14 per square metre
ÂA31
ÂParking Garage (underground, open air)
Â$11.66 per square metre
ÂA32
ÂRack Storage Systems regulated by the Building Code
Â$11.66 per square metre
 Group G: Agricultural  A33 High-Hazard Agricultural (G1) $11.66 per square metre A34 Other Agricultural (G2) $10.38 per square metre A35 Greenhouse Agricultural (G3) $9.36 per square metre A36 Agricultural with no human occupants (G4) $8.34 per square metre  All Occupancies
ÂÂ A37
ÂPermanent Tent / Air supported structure
Â$8.34 per square metre
ÂA38
ÂRepair / reclad wall or replace roof structure
Â$2.15 per square metre
ÂA39
ÂCeiling (new or replacement)
Â$0.58 per square metre
ÂA40
ÂMechanical Penthouse
Â$11.66 per square metre
ÂA41
ÂTemporary Building (Tent, Stages)
Â$299 each
ÂA42
ÂShoring (/m of length)
Â$17.94 per square metre
ÂA43
ÂUnderpinning (/m of length)
Â$17.94 per square metre
ÂA44 Design of Hazardous Areas regulated by the Building Code $30.11 per square metre A45 Multiple Unit Encapsulated Mass Timber Buildings greater than 3 storeys $30.11 per square metre  Designated Structures
ÂÂ A46
ÂCommunication Tower
Â$428 each
ÂA47
ÂCrane Runway
Â$637 each
ÂA48
ÂExterior Storage Tank
Â$428 each
ÂA49
ÂPedestrian Bridge (/m of length)
Â$49.71 per metre
ÂA50
ÂRetaining Wall (/m of length)
Â$24.88 per metre
ÂA51
ÂSign regulated by the Building Code
Â$428 each
- Alteration, Repair or Change of Use (Existing Construction)
Row
ÂDescription
ÂFee
ÂÂ Group A Assembly
ÂÂ B1
ÂRestaurant
Â$11.62 per square metre
ÂB2
ÂAll other assembly occupancies
Â$8.02 per square metre
ÂÂ Group B: Institutional
ÂÂ B3
ÂAll institutional occupancies
Â$8.02 per square metre
ÂÂ Group C: Residential
ÂÂ B4
ÂAccessory Apartment
Â$21.03 per square metre
ÂB5
ÂAll other Residential occupancies
Â$8.02 per square metre
ÂB6
ÂExterior door or door from garage into dwelling
Â$474 each
ÂB7
ÂBelow grade stair
Â$474 each
ÂB8
ÂElevator (Housing Permits only)
Â$474 each
ÂÂ Group D: Business and Personal Services
ÂÂ B9
ÂAll business and personal service occupancies
Â$8.02 per square metre
ÂÂ Group E: Mercantile
ÂÂ B10
ÂRestaurant
Â$11.62 per square metre
ÂB11
ÂAll other mercantile occupancies
Â$8.02 per square metre
ÂÂ Group F: Industrial
ÂÂ B12
ÂAll industrial occupancies
Â$7.31 per square metre
ÂÂ All Occupancies
ÂÂ B13
ÂElectromagnetic Locking Device
Â$707 first device plus $142 per additional device
ÂB14
ÂParking Structure Repair
Â$2.15 per square metre
ÂB15
ÂBalcony Guard Replacement (/m of length)
Â$2.60 per metre
ÂB16
ÂWindow Replacement or Enlargement (each)
Â$8.96 each B17 Special Ventilation Systems (each) $697
- Demolition
 Row
ÂDescription
ÂFee
ÂÂ Group C: Residential Housing
ÂÂ C1
ÂSingle / Semi-detached dwelling
Â$722 each
ÂC2
ÂAccessory building serving residential housing
Â$241 each
ÂÂ All Other Occupancies
ÂÂ C3
ÂComplete / Partial / Interior Demolition
Â$0.21 per square metre
($1,500 minimum fee)
- Mechanical and Fire Protection Work
 These fees apply to projects where mechanical or fire protection work is a stand-alone project.
Row
ÂDescription
ÂFee
ÂD1
ÂHeating, ventilation, air conditioning
Â$1.40 per square metre
ÂD2
ÂFire Alarm System (per storey)
Â$465 per storey
ÂD3
ÂReplacement Annunciator/Control Panel only (per storey served)
Â$465 per storey
ÂD4
ÂSprinkler System
Â$1.40 per square metre
ÂD5
ÂIn-rack sprinkler System
Â$1.40 per square metre
ÂD6
ÂStandpipe System (per riser)
Â$182 per riser
ÂD7
ÂEmergency Power
Â$896
ÂD8
ÂEmergency Lighting (per storey)
Â$239 per storey
ÂD9
ÂFireplace / Woodstove
Â$144
ÂD10
ÂHeating plant replacement
Â$233
Â
- Plumbing
Plumbing fees apply to all projects except for new single detached dwellings, new semi-detached dwellings, and new multiple unit residential buildings less than 4 storeys high.
Row
ÂDescription
ÂFee
ÂE1
ÂResidential Service Connection (per lot)
Â$218 per lot
ÂE2
ÂFixture
Â$21.29 each
ÂE3
ÂAppliance
Â$21.29 each
ÂE4
ÂRain Water Hopper
Â$21.29 each
ÂE5
ÂConversion from Septic System to sewer
Â$546
ÂE6
ÂBackflow preventer
Â$328 (first device) $109 per additional devices
ÂE7
ÂWater service (/length in m)
Â$21.29 per metre
ÂE8
ÂBuilding sanitary/storm drain, building sanitary/storm sewer (/length in m)
Â$21.29 per metre
ÂE9
ÂReplacement or re-lining of water distribution piping (/length in m)
Â$21.29 per metre
ÂE10
ÂManhole
Â$62.78 each
ÂE11
ÂCatchbasin
Â$62.78 each
ÂE12
ÂArea Drain
Â$62.78 each
ÂE13
ÂBackwater Valve / Sump Pump / Sewage Ejector
Â$144 each
Â
- On-Site Sewage Systems
These fees apply to any permit application where a septic system is affected by the project scope of work.
Row
ÂDescription
ÂFee
ÂF1
ÂNew System
Â$2,128
ÂF2
ÂReplacement of Leaching Bed
Â$1,139
ÂF3
ÂReplacement of Septic Tank or Minor Repair of Part of a System
Â$707
ÂF4
ÂEvaluation of System (no alterations required)
Â$284
ÂF5
ÂReview of Clearances Only
Â$284
Â
- Green Energy Systems
These fees apply to projects where green energy system installations are a stand-alone project.
Row
ÂDescription
ÂFee
ÂG1
ÂSolar domestic hot water systems (serving individual dwellings)
Â$144
ÂG2
ÂSolar domestic hot water systems (serving all other buildings)
Â$776
ÂG3
ÂSolar photovoltaic systems (serving individual dwellings)
Â$144
ÂG4
ÂSolar photovoltaic systems (serving all other buildings)
Â$776
ÂG5
ÂGeothermal Systems
Â$468Â G6
ÂWind Turbines (per turbine)
Â$310 G7
ÂDrain water heat recovery unit (serving individual dwellings)
Â$144
- Zoning Review of Permit Applications
Row
ÂDescription
ÂFee
ÂH1
ÂInfill Residential dwelling
Â$400
ÂH2
ÂNew single detached dwelling or new semi-detached dwelling
Â$100
ÂH3
ÂNew multiple unit residential buidings less than 4 storeys high (per building)
Â$400 H4
ÂAll other new mulitiple unit residential buildings and new non-residential projects (per building)
Â$950
ÂH5
ÂNon-housing interior alterations (per unit)
Â$200
ÂH6 Portables $200
The following by-law applies to all applications submitted after December 31, 2023.
Our current fees listed below are summarized from Schedule A of Markham's Building By-law 2023-177.
Â
Minimum Permit Fees
Description  | Fee  |
---|---|
Group C Residential construction  | $125  |
Group A, B, D, E and F occupancies  | $525  |
Private servicing of multiple lots (plumbing fees in addition to this fee) Â | $2,125 Â |
Non-residential Demolition  | $1,092  |
Â
- Administrative Fees
ÂRow Description
ÂFee
Â1.1 Transfer application to another permit applicant or change project address
Â$300
Â1.2 Transfer permit to another Owner
Â$300
Â1.3 Add additional contacts to permit record for Building Inspection correspondence $125 per permit record 1.4 Building complaint leading to issuance of an Order $100 1.5 Order to Comply
Â$450
Â1.6 Subsequent visit or file review to determine compliance with Order to Comply $125 per hour
(minimum 1 h)1.7 Stop Work Order
Â$1,500
Â1.8 Unsafe Building
Â$600
Â1.9 Initial Site Visit related to Unsafe Building conducted after hours $125 per hour
(minimum 3 h)1.10 Order Respecting Occupancy
Â$1,200
Â1.11 Subsequent Visits / File Review to determine compliance with an Unsafe Building or Order Respecting Occupancy
Â$125 per hour
(minimum 1 h during business hours; 3 h outside of business hours)1.12 Order to Comply or Stop Work Order issued prior to building permit
Â50% of permit fee
(maximum $5000)
Â1.13 Order Maintenance Fee $1,000 1.14 Additional Inspections due to non-remedied infraction
Â$200
Â1.15 Additional Inspection due to work not sufficiently complete
Â$200
Â1.16 Extend permit expiry date past 12 months
Â$525 or permit fee paid, whichever is less 1.17 Suspended permit / incomplete
Â$200 for housing
$525 for non-housing
Â1.18 Permit Maintenance Fee for infill residential permits $2,000 1.19 Septic Maintenance Fee $300 1.20 Registration of an Order on Title $500
- General Permit Fees
ÂRow Description
ÂFee
Â2.1
ÂPre-Application Review
Â$100
Â2.2
ÂSupplementary submissions, shop drawings, and permit revisions
Â$125 per hour
Â2.3 Resubmission to address incorrectly declared Applicable Law $300 2.4 Revisions to forms due to incorrectly declared information $250 2.5 Partial permit fee for non-housing (when requested after permit application)
Â$1000
Â2.6 Alternative Solution — first submission
Â$3,000 for multiple-unit residential and non-residential
$800 for low rise residential
Â2.7 Alternative Solution — supplementary submission
Â$250 each
Â2.8 Certified Model Supplemental Reviews (additional elevations, corner upgrade, rear upgrade, alternate floor layout, walk-out condition, look-out condition) $125 each 2.9 Change of Certified Model to existing Repeat Permit
Â$300 plus difference in permit fees
Â2.10
ÂFee not listed in Building Bylaw
Â$40 for every $1,000 of Construction Value
Â2.11
ÂRemediation / demolition of premises used for production of illicit drugs
Â$5,000
Â2.12
ÂReinstallation of a previously approved Air Supported Structure
Â$1,000
Â
Â
- Service Fees
Row
ÂDescription
ÂFee
Â3.1
ÂCertificate of Completion
Â$200
Â3.2
ÂCompliance Letter
Â$200
Â3.3
ÂProvincial License Applications (without a permit application)
Â$500
Â3.4
ÂProvincial License Applications (with a permit application)
Â$250
Â3.5
ÂSpatial Separation Agreements
Â$500
Â3.6
ÂZoning Preliminary Review – Low Rise Residential
Â$300
Â3.7
ÂZoning Preliminary Review – Interior alteration (including parking calculations)
Â$750 per unit
Â3.8
ÂZoning Preliminary Review — multiple-unit residential and non-residential projects
Â$1500 per building
Â3.9
ÂZoning Preliminary Review — Land Division
Â$1000 per lot
Â3.10 Zoning Preliminary Review — supplemental submissions $125 per hour 3.11
ÂZoning Searches
Â$75
Â3.12
ÂPre-Permit Consultation — per discipline
Â$800 for first submission
$300 for each resubmission
Â3.13 Reproduction of Documents $60 plus 110% cost of reproduction plus $125 per hour
- New Buildings and Additions (including Mezzanines or New Intermediate Floors)
Row
ÂDescription
ÂFee
ÂÂ Group A Assembly
ÂÂ A1
ÂTransportation Terminals
Â$22.71 per square metre
ÂA2
ÂPortable classrooms (each) (new or relocated)
Â$694 each
ÂA3
ÂOutdoor Pool
Â$15.85 per square metre
ÂA4
ÂAll Other Assembly Occupancies
Â$27.29 per square metre
ÂÂ Group B: Institutional
ÂÂ A5
ÂAll Institutional Occupancies
Â$29.54 per square metre
ÂÂ Group C: Residential
ÂÂ A6
ÂSingle Detached Dwelling (SDD)
Â$20.63 per square metre
ÂA7 Infill Residential Dwelling $23.12 per square metre A8
ÂMultiple Unit buildings less than 4 storeys high
Â$25.62 per square metre
ÂA9
ÂMultiple Unit buildings greater than 3 storeys, less than 13 storeys
Â$25.62 per square metre
ÂA10
ÂMultiple Unit buildings greater than 12 storeys high, less than 66 storeys or 250 m in height
Â$19.03 per square metre
ÂA11 Multiple Unit buildings greater than 65 storeys or 250 m in height $18.66 per square metre A12
ÂRepeat of Previously approved Certified Model
Â$16.91 per square metre
ÂA13
ÂHotel / Motel
Â$27.29 per square metre
ÂA14
ÂUnfinished Basement / Foundations
Â$7.04 per square metre
ÂA15
ÂDetached or semi-detached garage/carport
Â$661 each
ÂA16
ÂGarage incorporating a dwelling unit (GDU)
Â$1,927 each
ÂA17
ÂRepeat of previously approved GDU
Â$1,197 each
ÂA18
ÂAccessory utility building (ie. Garden shed, Gazebo) less than 20 m2
Â$142 each
ÂA19
ÂAccessory utility building (ie. Garden shed, Gazebo) 20 m2 or greater
Â$910 each
ÂA20 Single Detached Dwelling Unit (SDD) less than 37Â m2Â in building area $910 each A21
ÂDeck / Balcony / Covered Porch (each)
Â$142 each
ÂÂ Group D: Business and Personal Services
ÂÂ A22
ÂShell Only (including unfinished basement)
Â$17.60 per square metre
ÂA23
ÂPartitioned / Finished / Mezzanine
Â$22.71 per square metre
ÂA24
ÂTemporary Real Estate Sales Office
Â$2,677 each
ÂÂ Group E: Mercantile
ÂÂ A25
ÂShell Only (including unfinished basement)
Â$14.79 per square metre
ÂA26
ÂPartitioned / Finished / Mezzanine
Â$19.36 per square metre
ÂÂ Group F: Industrial
ÂÂ A27
ÂShell Only (including unfinished basement)
Â$11.44 per square metre
ÂA28
ÂPartitioned / Finished / Mezzanine
Â$15.83 per square metre
ÂA29
ÂGas Station / Canopy, Car Wash
Â$14.62 per square metre
ÂA30
ÂRepair garage
Â$15.83 per square metre
ÂA31
ÂParking Garage (underground, open air)
Â$11.44 per square metre
ÂA32
ÂFarm Building
Â$6.25 per square metre
ÂA33
ÂRack Storage Systems regulated by the Building Code
Â$11.44 per square metre
ÂÂ All Occupancies
ÂÂ A34
ÂPermanent Tent / Air supported structure
Â$8.18per square metre
ÂA35
ÂRepair / reclad wall or replace roof structure
Â$2.11 per square metre
ÂA36
ÂCeiling (new or replacement)
Â$0.57 per square metre
ÂA37
ÂMechanical Penthouse
Â$11.44 per square metre
ÂA38
ÂTemporary Building (Tent, Stages)
Â$294 each
ÂA39
ÂShoring (/m of length)
Â$17.60 per square metre
ÂA40
ÂUnderpinning (/m of length)
Â$17.60 per square metre
ÂÂ Designated Structures
ÂÂ A41
ÂCommunication Tower
Â$420 each
ÂA42
ÂCrane Runway
Â$625 each
ÂA43
ÂExterior Storage Tank
Â$420 each
ÂA44
ÂPedestrian Bridge (/m of length)
Â$48.76 per metre
ÂA45
ÂRetaining Wall (/m of length)
Â$24.41 per metre
ÂA46
ÂSign regulated by the Building Code
Â$420 each
- Alteration, Repair or Change of Use (Existing Construction)
Row
ÂDescription
ÂFee
ÂÂ Group A Assembly
ÂÂ B1
ÂRestaurant
Â$11.40 per square metre
ÂB2
ÂAll other assembly occupancies
Â$7.87 per square metre
ÂÂ Group B: Institutional
ÂÂ B3
ÂAll institutional occupancies
Â$7.87 per square metre
ÂÂ Group C: Residential
ÂÂ B4
ÂAccessory Apartment
Â$20.63 per square metre
ÂB5
ÂAll other Residential occupancies
Â$7.87 per square metre
ÂB6
ÂExterior door or door from garage into dwelling
Â$465 each
ÂB7
ÂBelow grade stair
Â$465 each
ÂB8
ÂElevator (Housing Permits only)
Â$465 each
ÂÂ Group D: Business and Personal Services
ÂÂ B9
ÂAll business and personal service occupancies
Â$7.87 per square metre
ÂÂ Group E: Mercantile
ÂÂ B10
ÂRestaurant
Â$11.40 per square metre
ÂB11
ÂAll other mercantile occupancies
Â$7.87 per square metre
ÂÂ Group F: Industrial
ÂÂ B12
ÂAll industrial occupancies
Â$7.18 per square metre
ÂÂ All Occupancies
ÂÂ B13
ÂElectromagnetic Locking Device
Â$694 first device plus $140 per additional device
ÂB14
ÂParking Structure Repair
Â$2.11 per square metre
ÂB15
ÂBalcony Guard Replacement (/m of length)
Â$2.55 per metre
ÂB16
ÂWindow Replacement or Enlargement (each)
Â$8.79 eachÂ
- Demolition
 Row
ÂDescription
ÂFee
ÂÂ Group C: Residential Housing
ÂÂ C1
ÂSingle / Semi-detached dwelling
Â$709 each
ÂC2
ÂAccessory building serving residential housing
Â$237 each
ÂÂ All Other Occupancies
ÂÂ C3
ÂComplete / Partial / Interior Demolition
Â$0.20 per square metre
($1,092 minimum fee)
- Mechanical and Fire Protection Work
 These fees apply to projects where mechanical or fire protection work is a stand-alone project.
Row
ÂDescription
ÂFee
ÂD1
ÂHeating, ventilation, air conditioning
Â$1.37 per square metre
ÂD2
ÂFire Alarm System (per storey)
Â$457 per storey
ÂD3
ÂReplacement Annunciator/Control Panel only (per storey served)
Â$457 per storey
ÂD4
ÂSprinkler System
Â$1.37 per square metre
ÂD5
ÂIn-rack sprinkler System
Â$1.37 per square metre
ÂD6
ÂStandpipe System (per riser)
Â$179 per riser
ÂD7
ÂEmergency Power
Â$879
ÂD8
ÂEmergency Lighting (per storey)
Â$235 per storey
ÂD9
ÂFireplace / Woodstove
Â$142
ÂD10
ÂHeating plant replacement
Â$229
ÂD11
ÂSpecial Ventilation Systems (each)
Â$694 each
- Plumbing
Plumbing fees apply to all projects except for new single detached dwellings, new semi-detached dwellings, and new multiple unit residential buildings less than 4 storeys high.
Row
ÂDescription
ÂFee
ÂE1
ÂResidential Service Connection (per lot)
Â$214 per lot
ÂE2
ÂFixture
Â$20.88 each
ÂE3
ÂAppliance
Â$20.88 each
ÂE4
ÂRain Water Hopper
Â$20.88 each
ÂE5
ÂConversion from Septic System to sewer
Â$536
ÂE6
ÂBackflow preventer
Â$321 (first device) $107 per additional devices
ÂE7
ÂWater service (/length in m)
Â$20.88 per metre
ÂE8
ÂBuilding sanitary/storm drain, building sanitary/storm sewer (/length in m)
Â$20.88 per metre
ÂE9
ÂReplacement or re-lining of water distribution piping (/length in m)
Â$20.88 per metre
ÂE10
ÂManhole
Â$61.58 each
ÂE11
ÂCatchbasin
Â$61.58 each
ÂE12
ÂArea Drain
Â$61.58 each
ÂE13
ÂBackwater Valve / Sump Pump / Sewage Ejector
Â$142 each
Â
- On-Site Sewage Systems
These fees apply to any permit application where a septic system is affected by the project scope of work.
Row
ÂDescription
ÂFee
ÂF1
ÂNew System
Â$2,088
ÂF2
ÂReplacement of Leaching Bed
Â$1,118
ÂF3
ÂReplacement of Septic Tank or Minor Repair of Part of a System
Â$694
ÂF4
ÂEvaluation of System (no alterations required)
Â$279
ÂF5
ÂReview of Clearances Only
Â$279
Â
- Green Energy Systems
These fees apply to projects where green energy system installations are a stand-alone project.
Row
ÂDescription
ÂFee
ÂG1
ÂSolar domestic hot water systems (serving individual dwellings)
Â$142
ÂG2
ÂSolar domestic hot water systems (serving all other buildings)
Â$762
ÂG3
ÂSolar photovoltaic systems (serving individual dwellings)
Â$142
ÂG4
ÂSolar photovoltaic systems (serving all other buildings)
Â$762
ÂG5
ÂGeothermal Systems
Â$460
ÂG6
ÂWind Turbines (per turbine)
Â$305
ÂG7
ÂDrain water heat recovery unit (serving individual dwellings)
Â$142
- Zoning Review of Permit Applications
Row
ÂDescription
ÂFee
ÂH1
ÂInfill Residential dwelling
Â$315
ÂH2
ÂNew single detached dwelling or new semi-detached dwelling
Â$78
ÂH3
ÂNew multiple unit residential buidings less than 4 storeys high (per building)
Â$315 H4
ÂAll other new mulitiple unit residential buildings and new non-residential projects (per building)
Â$787
ÂH5
ÂNon-housing interior alterations (per unit)
Â$131
ÂH6 Portables $131
The following by-law applies to all applications submitted after December 31, 2022 and before January 1, 2024.
The 2023 fees listed below are summarized from Schedule A of Markham's Building By-law 2023-18.
Â
Minimum Permit Fees
Description  | Fee  |
---|---|
Group C Residential construction  | $125  |
Group A, B, D, E and F occupancies  | $525  |
Private servicing of multiple lots (plumbing fees in addition to this fee) Â | $2,125 Â |
Non-residential Demolition  | $1,092  |
Â
- Administrative Fees
Row Description Fee 1.1 Transfer application to another permit applicant or change project address $300 1.2 Transfer permit to another Owner $300 1.3 Add additional contacts to permit record for Building Inspection correspondence $125 per permit record 1.4 Building complaint leading to issuance of an Order $100 1.5 Order to Comply $450 1.6 Subsequent visit or file review to determine compliance with Order to Comply $125 per hour
(minimum 1 h)1.7 Stop Work Order $1,500 1.8 Unsafe Building $600 1.9 Initial Site Visit related to Unsafe Building conducted after hours $125 per hour
(minimum 3 h)1.10 Order Respecting Occupancy $1,200 1.11 Subsequent Visits / File Review to determine compliance with an Unsafe Building or Order Respecting Occupancy $125 per hour
(minimum 1 h during business hours; 3 h outside of business hours)1.12 Order to Comply or Stop Work Order issued prior to building permit 50% of permit fee
(maximum $5000)1.13 Order Maintenance Fee $1,000 1.14 Additional Inspections due to non-remedied infraction $200 1.15 Additional Inspection due to work not sufficiently complete $200 1.16 Extend permit expiry date past 12 months $525 or permit fee paid, whichever is less 1.17 Suspended permit / incomplete $200 for housing
$525 for non-housing1.18 Permit Maintenance Fee for infill residential permits $2,000 1.19 Septic Maintenance Fee $300 1.20 Registration of an Order on Title $500
- General Permit Fees
Row Description Fee 2.1 Pre-Application Review $100 2.2 Supplementary submissions, shop drawings, and permit revisions $125 per hour 2.3 Resubmission to address incorrectly declared Applicable Law $300 2.4 Revisions to forms due to incorrectly declared information $250 2.5 Partial permit fee for non-housing (when requested after permit application) $1000 2.6 Alternative Solution — first submission $3,000 for multiple-unit residential and non-residential
$800 for low rise residential2.7 Alternative Solution — supplementary submission $250 each 2.8 Certified Model Supplemental Reviews (additional elevations, corner upgrade, rear upgrade, alternate floor layout, walk-out condition, look-out condition) $125 each 2.9 Change of Certified Model to existing Repeat Permit $300 plus difference in permit fees 2.10 Fee not listed in Building Bylaw $40 for every $1,000 of Construction Value 2.11 Remediation / demolition of premises used for production of illicit drugs $5,000 2.12 Reinstallation of a previously approved Air Supported Structure $1,000
- Service Fees
Row Description Fee 3.1 Certificate of Completion $200 3.2 Compliance Letter $200 3.3 Provincial License Applications (without a permit application) $500 3.4 Provincial License Applications (with a permit application) $250 3.5 Spatial Separation Agreements $500 3.6 Zoning Preliminary Review – Low Rise Residential $300 3.7 Zoning Preliminary Review – Interior alteration (including parking calculations) $750 per unit 3.8 Zoning Preliminary Review — multiple-unit residential and non-residential projects $1500 per building 3.9 Zoning Preliminary Review — Land Division $1000 per lot 3.10 Zoning Preliminary Review — supplemental submissions $125 per hour 3.11 Zoning Searches $75 3.12 Pre-Permit Consultation — per discipline $800 for first submission
$300 for each resubmission3.13 Reproduction of Documents $60 plus 110% cost of reproduction plus $125 per hour
Â
- New Buildings and Additions (including Mezzanines or New Intermediate Floors)
Row Description Fee  Group A Assembly  A1 Transportation Terminals $21.62 per square metre A2 Portable classrooms (each) (new or relocated) $661 each A3 Outdoor Pool $15.1 per square metre A4 All Other Assembly Occupancies $25.99 per square metre  Group B: Institutional  A5 All Institutional Occupancies $28.13 per square metre  Group C: Residential  A6 Single Detached Dwelling (SDD) $19.65 per square metre A7 Infill Residential Dwelling $22.02 per square metre A8 Multiple Unit buildings less than 4 storeys high $24.40 per square metre A9 Multiple Unit buildings greater than 3 storeys, less than 13 storeys $24.4 per square metre A10 Multiple Unit buildings greater than 12 storeys high, less than 66 storeys or 250 m in height $18.13 per square metre A11 Multiple Unit buildings greater than 65 storeys or 250 m in height $18.13 per square metre A12 Repeat of Previously approved Certified Model $16.11 per square metre A13 Hotel / Motel $25.99 per square metre A14 Unfinished Basement / Foundations $6.7 per square metre A15 Detached or semi-detached garage/carport $630 each A16 Garage incorporating a dwelling unit (GDU) $1,836 each A17 Repeat of previously approved GDU $1,140 each A18 Accessory utility building (ie. Garden shed, Gazebo) less than 20 m2 $136 each A19 Accessory utility building (ie. Garden shed, Gazebo) 20 m2 or greater $867 each A20 Single Detached Dwelling Unit (SDD) less than 37 m2 in building area $867 each A21 Deck / Balcony / Covered Porch (each) $136 each  Group D: Business and Personal Services  A22 Shell Only (including unfinished basement) $16.76 per square metre A23 Partitioned / Finished / Mezzanine $21.62 per square metre A24 Temporary Real Estate Sales Office $2,550 each  Group E: Mercantile  A25 Shell Only (including unfinished basement) $14.09 per square metre A26 Partitioned / Finished / Mezzanine $21.62 per square metre  Group F: Industrial  A27 Shell Only (including unfinished basement) $10.89 per square metre A28 Partitioned / Finished / Mezzanine $15.08 per square metre A29 Gas Station / Canopy, Car Wash $13.92 per square metre A30 Repair garage $15.08 per square metre A31 Parking Garage (underground, open air) $10.89 per square metre A32 Farm Building $5.96 per square metre A33 Rack Storage Systems regulated by the Building Code $10.89 per square metre  All Occupancies  A34 Permanent Tent / Air supported structure $7.79 per square metre A35 Repair / reclad wall or replace roof structure $2.01 per square metre A36 Ceiling (new or replacement) $0.54 per square metre A37 Mechanical Penthouse $10.89 per square metre A38 Temporary Building (Tent, Stages) $280 each A39 Shoring (/m of length) $16.76 per square metre A40 Underpinning (/m of length) $16.76 per square metre  Designated Structures  A41 Communication Tower $400 each A42 Crane Runway $596 each A43 Exterior Storage Tank $400 each A44 Pedestrian Bridge (/m of length) $46.44 per metre A45 Retaining Wall (/m of length) $23.25 per metre A46 Sign regulated by the Building Code $400 each
- Alteration, Repair or Change of Use (Existing Construction)
Row Description Fee  Group A Assembly  B1 Restaurant $10.85 per square metre B2 All other assembly occupancies $7.50 per square metre  Group B: Institutional  B3 All institutional occupancies $7.50 per square metre  Group C: Residential  B4 Accessory Apartment $19.65 per square metre B5 All other Residential occupancies $7.50 per square metre B6 Exterior door or door from garage into dwelling $443 each B7 Below grade stair $443 each B8 Elevator (Housing Permits only) $443 each  Group D: Business and Personal Services  B9 All business and personal service occupancies $7.50 per square metre  Group E: Mercantile  B10 Restaurant $10.85 per square metre B11 All other mercantile occupancies $7.50 per square metre  Group F: Industrial  B12 All industrial occupancies $6.83 per square metre  All Occupancies  B13 Electromagnetic Locking Device $661 first device plus $134 per additional device B14 Parking Structure Repair $2.01 per square metre B15 Balcony Guard Replacement (/m of length) $2.43 per metre B16 Window Replacement or Enlargement (each) $8.37 eachÂ
- Demolition
Row Description Fee  Group C: Residential Housing  C1 Single / Semi-detached dwelling $675 each C2 Accessory building serving residential housing $225 each  All Other Occupancies  C3 Complete / Partial / Interior Demolition $0.19 per square metre
($1,092 minimum fee)
- Mechanical and Fire Protection Work
These fees apply to projects where mechanical or fire protection work is a stand-alone project.
ÂRow Description Fee D1 Heating, ventilation, air conditioning $1.31 per square metre D2 Fire Alarm System (per storey) $436 per storey D3 Replacement Annunciator/Control Panel only (per storey served) $436 per storey D4 Sprinkler System $1.31 per square metre D5 In-rack sprinkler System $1.31 per square metre D6 Standpipe System (per riser) $171 per riser D7 Emergency Power $838 D8 Emergency Lighting (per storey) $224 per storey D9 Fireplace / Woodstove $136 D10 Heating plant replacement $219 D11 Special Ventilation Systems (each) $661 each
- Plumbing
Plumbing fees apply to all projects except for new single detached dwellings, new semi-detached dwellings, and new multiple unit residential buildings less than 4 storeys high.
ÂRow Description Fee E1 Residential Service Connection (per lot) $204 per lot E2 Fixture $19.89 each E3 Appliance $19.89 each E4 Rain Water Hopper $19.89 each E5 Conversion from Septic System to sewer $510 E6 Backflow preventer $306 (first device) $102 per additional devices E7 Water service (/length in m) $19.89 per metre E8 Building sanitary/storm drain, building sanitary/storm sewer (/length in m) $19.89 per metre E9 Replacement or re-lining of water distribution piping (/length in m) $19.89 per metre E10 Manhole $58.65 each E11 Catchbasin $58.65 each E12 Area Drain $58.65 each E13 Backwater Valve / Sump Pump / Sewage Ejector $136 each
- On-Site Sewage Systems
These fees apply to any permit application where a septic system is affected by the project scope of work.
ÂRow Description Fee F1 New System $1,989 F2 Replacement of Leaching Bed $1,065 F3 Replacement of Septic Tank or Minor Repair of Part of a System $661 F4 Evaluation of System (no alterations required) $266 F5 Review of Clearances Only $266
- Green Energy Systems
These fees apply to projects where green energy system installations are a stand-alone project.
ÂRow Description Fee G1 Solar domestic hot water systems (serving individual dwellings) $136 G2 Solar domestic hot water systems (serving all other buildings) $726 G3 Solar photovoltaic systems (serving individual dwellings) $136 G4 Solar photovoltaic systems (serving all other buildings) $726 G5 Geothermal Systems $439 G6 Wind Turbines (per turbine) $291 G7 Drain water heat recovery unit (serving individual dwellings) $136 - Zoning Review of Permit Applications
Row
ÂDescription
ÂFee
ÂH1
ÂInfill Residential dwelling
Â$300
ÂH2
ÂNew single detached dwelling or new semi-detached dwelling
Â$75
ÂH3
ÂNew multiple unit residential buidings less than 4 storeys high (per building)
Â$300 H4
ÂAll other new mulitiple unit residential buildings and new non-residential projects (per building)
Â$750
ÂH5
ÂNon-housing interior alterations (per unit)
Â$125
Â
Â
- Building Permit and Fee By-law 2021-114 [PDF] effective January 1, 2022 to December 31, 2022Â
- Building Permit and Fee By-law 2020-140 [PDF] effective January 1, 2021 to December 31, 2021Â
- Building Permit and Fee By-law 2019-136 [PDF] effective January 1, 2020 to December 31, 2020Â
- Building Permit and Fee By-law 2019-20 [PDF] effective January 1, 2019 to December 31, 2019Â
- Building Permit and Fee By-law 2017-150 [PDF] effective January 1, 2018 to December 31, 2018
- Building Permit and Fee By-law 2016-148 [PDF] effective January 1, 2017 *Table 1 revised September 5, 2017 to December 31, 2017Â
- Building Permit and Fee By-law 2015-166 [PDF] effective January 1, 2016 to December 31, 2016
Contact
101 Town Centre Boulevard
Markham, ON, L3R 9W3
Hours
8:30 AM to 4:30 PM