Green Building
The City of Markham supports environmentally sustainable building technologies and materials that satisfy the Ontario Building Code. Green building features may include:
- sustainable, durable and low maintenance building design and operation
- energy and water efficiency
- attention to indoor and outdoor air quality
- use of recycling and conservation in building materials and products
Are you thinking of adding green building features into your home?
Building permits may be required.
The Building Code Act and Ontario Building Code control the construction of buildings in Ontario. Property owners must get a building permit before the installation of green building technologies. The Act also requires manufacturers, suppliers and retailers make sure that products comply with the standards prescribed by the building code.
Click the links below for information about permits for projects that bring together these green technologies.
- Solar Energy
In residential applications, solar energy is most commonly used to:
- Heat water for domestic use
- Provide primary and supplemental heating of dwellings
- Generate electricity through the use of solar photovoltaic [PV] technologies
- Heat water for use in swimming pools and spas
Solar Domestic Hot Water Systems (SDHW)
Building permits are required for the installation of all solar domestic hot water systems.
The Ontario Building Code regulates two types of solar energy systems used for heating domestic potable water:
- Non-packaged systems are designed as complete systems but are made up of individual components not tested or evaluated together as a proprietary system.
- Factory packaged SDHW systems generally consist of a complete series of assembled components which provide solar pre-heated water to a domestic hot water storage tank through the use of solar thermal collectors, heat transfer exchangers (utilizing a liquid heat transfer media and potable water) and include all appropriate plumbing and electrical controls to affect the transfer. These systems must be certified by a recognized testing agency.
Building Permit Requirements Non-Packaged SDHW Systems:
These systems must be designed by a professional engineer licensed in the Province of Ontario with good engineering practice. Permit applications for non-packaged systems must include two copies each of the following:
- Plumbing schematic of the entire system including connection details to the potable water system.
- The location, size and weight of the solar collectors and the method of installing them to the building.
- System component specifications including any testing or evaluation data.
- A statement from a professional engineer certifying that the proposed system conforms to the intent of CSA International Technical Information Letter MSE-45 (as amended), the referenced standards applicable to SDHW components listed in Table 1 of the TIL and the intent of the requirements for SDHW systems in the Ontario Building Code.
All documents must be stamped and signed according to practice standards by Professional Engineer’s Ontario.
Building Permit Requirements Packaged SDHW Systems:
Permit applications for factory packaged systems must be accompanied by the following:
- Drawings (schematic are acceptable) of the entire system including details of the connection to the potable water system
- The location, size and weight of the solar collectors and the method of installing them to the building
- Evidence that the system has been tested and certified by CSA
Installation Requirements for both Non-Packaged and Factory Packaged SDHW Systems:
Installation of these systems will be done by a qualified installer certified by the Canadian Solar Energy Industry Association or will be inspected and certified by a professional engineer licensed in the Province of Ontario.
Solar Photovoltaic [PV] Systems
Building permits are required for the installation of solar photovoltaic systems [arrays] except for the following:
- Arrays mounted independently from a building on a pole or supporting structure
- Arrays mounted on detached, semi-detached or townhouse dwellings, farm buildings or accessory structures that meet the following criteria:
- they are fixed directly to the roof so that the array does not project beyond the ridge or eaves and is not more than 400mm [16 inches] above the roof surface, and
- the structure of the roof has been assessed, and the array installation is carried out according to a design by a suitably qualified and experienced person, such as a professional engineer
- Wind Energy
Wind energy systems are generally broken into two main applications.
- Large scale operations that provide power to the local utility grid, similar to hydro or natural gas electrical generation facilities. Turbines clustered together into ‘wind farms’ that produce energy for many buildings or communities.
Small scale operations provide local, on-site power to a home or business. Turbines are placed at the same site where the electricity will be used. Any additional energy that is generated, exceeding the needs of the user, can be sent to the local electrical grid with their permission.
Building permits are required for the following:
- For the installation of any wind turbine generator that is attached to a building
- For any structure used to support a wind turbine generator with a rated output of more than 3kW;
Visit the following website for more information on wind energy:
- Storm Sewage and Greywater Use
The 2006 Ontario Building Code now permits using storm sewage or greywater to flush toilets, urinals and for priming traps.
A permit is required prior to installing either system.
Storm sewage is water that has been discharged from a surface as a result of rainfall, snow melt or snowfall and collected for use.
Greywater is sanitary sewage from sinks or bathtubs.
Both storm sewage and greywater are considered non-potable sources of water so it is important to note that these systems must be clearly and permanently marked and cannot be interconnected with a potable water system.