1. | Masonry Veneer Ties & Attachments | January 2025 |
2. | Moisture Barrier on Foundation Walls | January 2025 |
3. | Principal Exhaust Fan Controls | January 2025 |
4. | Adjustable Steel Columns | January 2025 |
5. | Smoke Alarms (Part 9) | January 2025 |
6. | Installations of Air Barrier at Windows and Doors | January 2025 |
7. | Installations of Stairs on Ceramic or Marble Flooring | January 2025 |
8. | Waterproof Wall Finish Around Bathtubs | January 2025 |
9. | Air Barrier & Recessed Light Fixtures | January 2025 |
10. | Masonry Construction in Cold Weather | January 2025 |
11. | Notching and Drilling of Framing Members | January 2025 |
12. | Footings – Placement of Concrete | January 2025 |
13. | Flashing at Cold Room Concrete Porch Slab | January 2025 |
14. | Fire Protection for Gas and Electric Ranges | January 2025 |
15. | Support of Beams | January 2025 |
19. | Supply and Return Air Ducts in Exterior Walls | January 2025 |
20. | Steel Beam and Column Connection | January 2025 |
21. | “Header-Wrap” Air Barrier | January 2025 |
22. | Lateral Support of Foundation Walls | January 2025 |
24. | Hot Water Piping Insulation | January 2025 |
27. | Gas Fireplace Vent Duct Penetration of the Air Barrier | January 2025 |
28. | Rooms Over Garages | January 2025 |
29. | Building Drain Cleanout | January 2025 |
34. | Vapour Barrier for 2LBS Closed Cell Spray Applied Polyurethane Foam Insulation | January 2025 |
36. | Wet Venting | January 2025 |
37. | 45 Minute Fire-Resistance Rating of Exposing Garage Walls | January 2025 |
38. | Carbon Monoxide Detectors | January 2025 |
39. | 45 Minute Fire Resistance Rating Wall with Rigid Insulation | January 2025 |
40. | Vinyl Cladding of Walls Less Than 2 Feet to the Property Line | January 2025 |
41. | Protection of Plumbing Systems from Contamination (Water Treatment Devices) | January 2025 |
42. | Staggered Town Housings 45 Minute Fire-Resistance Rated Wall | January 2025 |
43. | Exterior Insulation Finish Systems (EIFS) Housing | January 2025 |
44. | Piping Protection from Frost | January 2025 |
45. | Inspection of Fire Protection Systems | January 2025 |
47. | Winter Construction (Protection from Freezing) | January 2025 |
48. | Construction of Gable Ends in Housing with a Limiting Distance Less 1.2 merter (3’-11’) | January 2025 |
49. | Residential Suites Over Commercial Suites | January 2025 |
52. | Concrete Mixes for Housing | January 2025 |
53. | Windows Over Stairs, Ramps & Landings | January 2025 |
54. | Uniform Risers and Treads | January 2025 |
55. | Energy Efficiency of Manufactured Windows for Buildings of Residential Occupancy | January 2025 |
56. | Required Landings for Dwellings | January 2025 |
58. | Slope of Roof Surfaces | January 2025 |
59. | Plastic Water Service Pipe | January 2025 |
60. | Swinging Door Standards, Performance and Resistance to Forced Entry for Housing | January 2025 |
61. | Protection from Precipitation – Residential Occupancy (First & Second Planes of Protection) | January 2025 |
62. | Loading on Guards | January 2025 |
63. | Required Guards (Interior Stairs) | January 2025 |
64. | Required Location of Guards (Adjacent Interior/Exterior Lower Surface) | January 2025 |
69. | Landing Configurations for Dwelling Units | January 2025 |
70. | Permitted Openings in Wall Assemblies | January 2025 |
72. | Party Wall Construction | January 2025 |
73. | Termination of Party Wall Between Dwellings | January 2025 |
74. | Reduction in Thickness of Fire Separation by Beams and Joists | January 2025 |
75. | Slip Resistance of Ramps and Stairs | January 2025 |
77. | Water Conservation for Dwellings | January 2025 |
78. | Duct Sealing for Dwellings | January 2025 |
79. | Finger Jointed Lumber for Dwellings | January 2025 |
80. | Sound Vibration for Building Services for Dwellings | January 2025 |
81. | Permitted Openings in Wall Fire Separation | January 2025 |
82. | Stud Wall Reinforcement for Future Grab Bars in Dwelling Units | January 2025 |
83. | Egress from Dwelling Units | January 2025 |
84. | Clearance to Electrical Conductors | January 2025 |
86. | Ceramic Tile Flooring on Panel Type Subfloor | January 2025 |
87. | Temperature Control in Dwelling Units | January 2025 |
88. | Opening in Guards/Design to Prevent Climbing | January 2025 |
94. | New Home Report | January 2025 |
95. | Testing of Drainage and Venting Systems — Sewer Lateral Extensions | January 2025 |
96. | Elevating Devices in Houses | January 2025 |
97. | Size and Capacity of Water Service for House with One Dwelling Unit | January 2025 |
98. | Shoring Requirements for Housing Foundation Walls | January 2025 |
99. | Construction and Demolition Site Fencing | January 2025 |
101. | Structural Sufficiency of Glass for Houses | January 2025 |
102. | Conducting Inspections During COVID-19 | January 2025 |
103. | Plumbing System Sewer Inspection for Infill Housing | January 2025 |
104. | Infill Housing Strategy - Non-Conformance with the Building Permit Documents | January 2025 |
105. | Infill Housing Strategy - Start of Construction Inspections | January 2025 |
106. | Dimensions for Runs and Rectangular Treads - Housing | January 2025 |
107. | Fire Sprinkler of Furnace Rooms in Houses with Two Dwelling Units | January 2025 |
108. | Protection from Backflow | January 2025 |